05 ottobre 2019
Our associate Eng. Gianluca Elmi was invited to represent ENSER for an interview dedicated to the design of a new automated path inside the Orogel industrial complex. The interview was held at Teleromagna head offices in Cesena.
The new steel structure, designed with BIM methodology, will consist of a 190m suspended tunnel for the transportation of industrial products to the new warehouse of Orogel.