Urgent works of civil defense for the monitoring analysis of the new morphology of the northern side that was subject to a landslide
The technical consultancy of ENSER consisted of:
Based on the data collected and considering the possibility of a reactivation of the landslide, even with rapid and sudden dynamics (high danger), the local Authority immediately recognized the necessity to entrust an urgent task for the detailed study of the instability, of the new morphology of the places and for the setting-up of an instrumental monitoring. The monitoring will allow the definition of a suitable civil defense Emergency Plan.